Change Language :
At the Eschweiler waste incineration plant, we have replaced the existing trailing cables with an e-chain® that was developed from the ground up for use in adverse environmental conditions. The installation of the chain on the 70-meter-long crane track placed high demands on logistics and coordination because it was carried out while the incineration lines were in operation.
Whether you're interested in end-to-end, fully assembled solutions or looking to build your own customizable project, let us assist you with a solution based on your specific application and requirements. Contact us via the form below or call us at (800) 521-2747 to discuss your project today!