Change Language :
Becker Marine Systems initiated the innovative project of the world's first LNG HYBRID barge (seagoing vessel) with Aida Cruises to supply power to cruise ships during their port layover. So far, no shore-side power supply for cruise ships has been implemented in Europe, with the exception of Hamburg. The implementation of a permanently installed system is usually time-consuming and cost-intensive and has so far been avoided by the ports.
Whether you're interested in end-to-end, fully assembled solutions or looking to build your own customizable project, let us assist you with a solution based on your specific application and requirements. Contact us via the form below or call us at (800) 521-2747 to discuss your project today!