Change Language :
This marine application was literally held together with tape and ties! We were glad to assist on the redesign of this chain and cable, providing design assistance. The team onsite was using several kinds of tape to keep their operation in production until they contacted igus for information on the best solution. We provided a cost saving package that increased their production and efficiency.
17,000 trolley hours and still in operation
Decreased container throughput as a result of unplanned crane downtime can have significant financial ramifications for terminal operators. This long span RMG crane is equipped with a chain and cable that has been active in the field for over six years, clocking 17,000 trolley hours!