Line up two inner side links, side by side. Attach an outer side link between
Assemble crossbars - Push down and snap in by using a screwdriver
Assemble clips (Energy Chains® with crossbars every other link) - Push down and snap in
Assemble E-Tube lids/bottoms - Attach to the connector at an angle - Snap in
Remove crossbars, clips, lids and bottoms at the outer links...
...guide the screwdriver into the slot between side links and release it by levering ...
...remove the outer links to the side...
...and separate the Energy Chain®
Remove crossbars - Insert screwdriver into the slot, push down, release by lever action
Remove clips - Insert screwdriver into the slot and push down, release by lever action
Remove lids/bottoms - Insert screwdriver into the slot, release by lever action
Release only one side to swivel the lid
Subscribe to
e-newsletter
Contacts in your location (can be on-site within 24-48 hours)
About Energy Chains®Product OverviewProduct Selector3D-CAD libraryPart No. searchRequest a quoteCatalog/sample requestEmail the product expertApplication examplesAssembly InstructionsVideosTechTalk Design Advice SeriesDownloads
More than 100,000 products available! Open Mon-Fri 8:00 am - 8:00 pm EST.
No minimum order